Event Id | 9 |
Source | IdeChnDr |
Description | The device, %1, did not respond within the timeout period. |
Event Information | Read the SCSI controller manufacturers technical manual to determine the termination requirements. Many modern SCSI controllers require active terminators (at least one of the devices on the bus must provide termination power). Proper termination involves both a terminator (resistor) and a device that supplies a signal to the bus for termination power. The SCSI-2 standard specifies that a controller (initiator) must supply termination power. Therefore, any controller that claims to be SCSI-2 compatible probably does supply termination power, but you should check if you are unsure. Also, many devices, especially drives, give you the option of providing termination power; if you have a jumper on the drive that reads Trmpwr, you should enable this jumper. |
Reference Links | How to troubleshoot Event ID 9, Event ID 11, and Event ID 15 error messages Windows Operating System (IdeChnDr) |
Catch threats immediately
We work side-by-side with you to rapidly detect cyberthreats
and thwart attacks before they cause damage.